SMT patch processing requires that the qualified rate of surface mount boards, after solder paste printing, component placement, and exiting the reflow oven, reaches or approaches 100%. This means achieving zero (or near-zero) defect reflow soldering quality, while also ensuring all solder joints meet specified mechanical strength requirements.
Jul 8th,2026 124 Views

Description

I. Establishing Quality Objectives for SMT Patch Processing Plants

SMT patch processing requires that the qualified rate of surface mount boards, after solder paste printing, component placement, and exiting the reflow oven, reaches or approaches 100%. This means achieving zero (or near-zero) defect reflow soldering quality, while also ensuring all solder joints meet specified mechanical strength requirements.
Only products meeting these criteria can deliver high quality and high reliability.
Quality objectives must be measurable. Currently, the world's leading enterprises control SMT defect rates at ≤10ppm (10 parts per million), which is the target pursued by every SMT processing plant.
Enterprises should formulate short-term, medium-term, and long-term objectives based on the complexity of their processed products, equipment conditions, and process capabilities.

II. Process Approach

  1. Compile enterprise-specific normative documents, including DFM enterprise specifications, general processes, inspection standards, and audit and review systems.
  2. Achieve high-quality SMT products and improve SMT production capacity and efficiency through systematic management and continuous monitoring and control.
  3. Implement full-process control covering: SMT product design → procurement control → production process control → quality inspection → drawing and document management → product protection → service provision → data analysis → personnel training.
SMT product design and procurement control are not covered in this article. The following sections detail the content of production process control.

III. Production Process Control

The production process directly affects product quality. Therefore, all factors influencing production process quality—including process parameters, personnel, equipment, materials, processing, monitoring and testing methods, and the environment—must be controlled and kept under regulated conditions.
Controlled conditions include:
  1. Design schematics, assembly drawings, sample parts, packaging requirements, etc.
  2. Formulate product process documents or work instructions, such as process flow cards, operation specifications, and inspection and test instructions.
  3. Ensure production equipment, tooling, fixtures, molds, and jigs are always qualified and effective.
  4. Configure and use appropriate monitoring and measuring devices to control these characteristics within specified or allowable ranges.
  5. Define clear quality control points. The key processes in SMT are solder paste printing, component placement, reflow soldering, and wave soldering temperature control.
Requirements for quality control points: On-site identification of control points; standardized control point documents; correct, timely, and clear control data records; analysis and processing of control data; regular PDCA (Plan-Do-Check-Act) evaluations; and full traceability.
In SMT production, quota management of solder paste, patch adhesive, and component loss should be implemented as part of key process control.

Case Study: Quality Control Process Management in an Electronics Factory

1. New Product Introduction (NPI) Control

  1. Convene a pre-trial production meeting involving production, quality, process, and other relevant departments to explain the production process flow of the trial product and clarify the key quality points for each workstation.
  2. The manufacturing department arranges production line setup according to the process flow or as directed by engineering personnel. During the trial production, responsible engineers (process engineers) from each department must be on-site to track, promptly handle abnormalities, and maintain records.
  3. The quality department conducts component verification and various performance and functional tests on the trial product, and completes the corresponding trial production report.

2. ESD (Electrostatic Discharge) Control

  1. Processing Area Requirements: Warehouses, placement workshops, and post-soldering workshops must meet ESD control requirements. Anti-static materials shall be laid on the ground, and anti-static mats (surface impedance 10⁴-10¹¹Ω) shall be laid on workbenches, connected to electrostatic grounding buckles (1MΩ±10%).
  2. Personnel Requirements: Personnel entering the workshop must wear anti-static clothing, shoes, and caps. Wired electrostatic wrist straps must be worn when contacting products.
  3. Materials Requirements: Board transfer racks, packaging foam, and bubble bags must meet ESD requirements with surface impedance <10¹⁰Ω.
  4. Equipment Requirements: Board transfer carts must be grounded via external chains. Equipment leakage voltage must be <0.5V, ground impedance <6Ω, and soldering iron ground impedance <20Ω. All equipment shall be evaluated for independent external grounding wires.

3. MSD (Moisture Sensitive Device) Control

  1. BGA, IC, and pin-packaged components are prone to moisture absorption under non-vacuum (nitrogen) packaging conditions. When subjected to SMT reflow, moisture evaporates due to heat, causing soldering abnormalities. Therefore, 100% baking is required.
  2. BGA Control Specifications:
    (1) Unopened vacuum-packed BGAs shall be stored in an environment with temperature <30°C and relative humidity <70%, with a shelf life of 1 year.
    (2) Opened vacuum-packed BGAs shall be marked with the opening date. Unused BGAs shall be stored in a moisture-proof cabinet at ≤25°C and 65%RH, with a storage period of 72 hours.
    (3) Unused opened BGAs or leftover materials must be stored in a moisture-proof cabinet (≤25°C, 65%RH). BGAs returned to the main warehouse shall be baked and then repackaged under vacuum.
    (4) BGAs exceeding the storage period must be baked at 125°C for 24 hours. For components that cannot be baked at 125°C, bake at 80°C for 48 hours (total baking time for multiple cycles must be <96 hours) before use.
    (5) Special baking specifications for components shall be separately documented in SOPs.
  3. PCBs with a storage period >3 months must be baked at 120°C for 2-4 hours.

4. PCB Control Specifications

  1. PCB Unpacking and Storage:
    (1) Unopened PCBs within 2 months of manufacture can be used directly on the production line.
    (2) PCBs within 2 months of manufacture must be marked with the opening date after unpacking.
    (3) Opened PCBs within 2 months of manufacture must be completely used on the production line within 5 days.
  2. PCB Baking:
    (1) PCBs opened for more than 5 days within 2 months of manufacture: Bake at 120±5°C for 1 hour.
    (2) PCBs exceeding 2 months of manufacture: Bake at 120±5°C for 1 hour before use.
    (3) PCBs 2 to 6 months old: Bake at 120±5°C for 2 hours before use.
    (4) PCBs 6 months to 1 year old: Bake at 120±5°C for 4 hours before use.
    (5) Baked PCBs must be used within 5 days. Unused PCBs require an additional 1-hour bake before use.
    (6) PCBs exceeding 1 year of manufacture: Bake at 120±5°C for 4 hours, then send to the PCB factory for re-tinning before use.
  3. IC Vacuum Packaging Storage Period:
    (1) Pay attention to the sealing date on each vacuum-packed box.
    (2) Shelf life: 12 months; storage conditions: temperature <40°C, humidity <70% RH.
    (3) Inventory control: Follow the "first-in, first-out" principle.
    (4) Check the humidity indicator card: The displayed value should be <20% (blue). If >30% (red), the IC has absorbed moisture.
    (5) Opened IC components not used within 48 hours must be re-baked before the next production run to remove moisture:
    • High-temperature resistant packaging materials: 125°C (±5°C) for 24 hours.
    • Non-high-temperature resistant packaging materials: 40°C (±3°C) for 192 hours.
      Unused components shall be returned to the moisture-proof cabinet for storage.

5. Report Control

  1. Process, test, and maintenance reports must be prepared for each product model. Report content includes serial numbers, defect issues, time periods, quantities, defect rates, cause analysis, etc., to facilitate traceability of abnormalities.
  2. If the same defect rate reaches 3% during production (testing), the quality department shall request engineering to implement improvements and analyze the cause. Production may only resume after confirmation.
  3. The supplier shall compile monthly process, test, and maintenance reports at the end of each month and send them to our company's quality and process departments via email.

6. Solder Paste Printing Control

  1. Solder paste shall be stored at 2-10°C, issued according to the first-in, first-out principle, and managed with control labels. Unopened solder paste may be stored at room temperature for no more than 48 hours. Unused solder paste shall be returned to the refrigerator for refrigeration in a timely manner. Opened solder paste must be used within 24 hours; unused opened paste shall be returned to the refrigerator for storage with proper records.
  2. For automatic solder paste printers, collect solder paste from both sides of the squeegee every 20 minutes, and add new solder paste every 2-4 hours.
  3. For mass production, measure solder paste thickness at 9 points on the first article. Solder thickness standard: Upper limit = stencil thickness + 40% of stencil thickness; Lower limit = stencil thickness + 20% of stencil thickness. If using a fixture for printing, mark the fixture number on the PCB and corresponding fixture to facilitate confirmation of fixture-related defects. Reflow soldering temperature profile data shall be transmitted at least once daily. Solder thickness is controlled by SPI, with measurements taken every 2 hours. Post-reflow visual inspection reports shall be transmitted every 2 hours, and measurement data shall be communicated to our company's process department.
  4. For defective solder paste prints, clean the PCB surface with lint-free cloth and board cleaning agent, then blow off residual tin powder with an air gun.
  5. Conduct self-inspection for solder paste offset or solder spikes before component placement. If printing defects occur, analyze the root cause promptly and focus on checking the abnormal points after adjustment.

7. Component Placement Control

  1. Material Verification: Before production, verify that BGA and IC components are vacuum-packed. For non-vacuum-packed components, check the humidity indicator card for moisture absorption.
    (1) When loading materials, verify the feeder positions against the loading list, check for incorrect material loading, and maintain loading records.
    (2) Placement program requirements: Ensure placement accuracy.
    (3) Conduct self-inspection for placement offset after mounting. If a template collision occurs, re-place the components.
    (4) For each product model, IPQC shall take 5-10 boards every 2 hours for DIP wave soldering and ICT (FCT) functional testing. Passed boards shall be marked accordingly.

8. Reflow Soldering Control

  1. When passing through the reflow oven, set the oven temperature based on the largest electronic component, and use a temperature measurement board corresponding to the product to test the oven temperature. Import the temperature profile to verify compliance with lead-free solder paste soldering requirements.
  2. Lead-free Oven Temperature Control Parameters:
    • Heating rate: 1℃~3℃/sec
    • Cooling rate: -1℃~-4℃/sec
    • Constant temperature: 150~180℃ for 60~120sec
    • Time above melting point (217℃): 30~60sec
    • Time above 220℃: 30~60sec
  3. Maintain a product spacing of ≥10cm to avoid uneven heating and cold solder joints.
  4. Do not use card boards to place PCBs to avoid component damage. Use turnover carts or anti-static foam instead.

9. Component Placement Visual and X-ray Inspection

  1. BGA components shall be inspected by X-ray every 2 hours to check soldering quality, and verify other components for offset, insufficient solder, voids, and other soldering defects. If 2 consecutive defective boards are found, notify technical personnel for adjustment.
  2. Both BOT and TOP sides must pass AOI (Automatic Optical Inspection) quality checks.
  3. Defective products shall be labeled with defect labels indicating the defect location and placed in the defective product area, with clear on-site status distinction.
  4. SMT placement yield requirement: >98%. If the yield exceeds the standard and is documented in reports, an abnormality order shall be issued for analysis and improvement. Production shall be stopped for rectification if no improvement is seen for 3 consecutive hours.

10. Post-Soldering

  1. Lead-free solder pot temperature shall be controlled at 255-265℃, with the minimum solder joint temperature on the PCB board being 235℃.
  2. Basic Wave Soldering Setup Requirements:
    a. Dip time: Wave 1 controlled at 0.3~1 second; Wave 2 controlled at 2~3 seconds.
    b. Conveyor speed: 0.8~1.5 meters per minute.
    c. Conveyor inclination: 4-6 degrees.
    d. Flux spray pressure: 2-3 Psi.
    e. Needle valve pressure: 2-4 Psi.
  3. After through-hole components pass through wave soldering, all products shall undergo full inspection. Boards shall be separated by foam to avoid component collision and scratching.

11. Testing

  1. ICT Testing: Separate NG and OK products. Passed boards shall be affixed with ICT test labels and separated by foam.
  2. FCT Testing: Separate NG and OK products. Passed boards shall be affixed with FCT test labels and separated by foam. Test reports shall be prepared, with serial numbers on the reports corresponding to those on the PCB boards. NG products shall be sent for repair promptly, and defective product repair reports shall be maintained.

12. Packaging

  1. For process transfer, use turnover carts or thick anti-static foam. PCBAs shall not be stacked to avoid collision, impact, or compression.
  2. For shipped PCBAs, use anti-static bubble bags (of consistent size) wrapped with foam (extending ≥5cm beyond the PCBA) to provide cushioning against external forces. Secure with adhesive tape and ship in anti-static plastic boxes with dividers between products.
  3. Plastic boxes shall be stacked without pressing the PCBAs inside. The interior of the boxes shall be clean, and the outer boxes shall have clear markings including: manufacturer, order number, product name, quantity, and delivery date.

13. Shipping

  1. Shipping must be accompanied by FCT test reports, defective product repair reports, and outgoing inspection reports—none of which may be missing.